888集团电子游戏(中国·VIP认证)官方网站-BinG百科

News Category

Your Position:Home>News>Typical user>Electrolytic Aluminum Project of Xinjiang East Hope Nonferrous Metals Co. Ltd.

Electrolytic Aluminum Project of Xinjiang East Hope Nonferrous Metals Co. Ltd.

Time:2015-09-27 Click:6135

    Electrolytic Aluminum Project of Xinjiang East Hope Nonferrous Metals Co. Ltd. is one of its massive projects, with an annual output of 2 × 500,000 tons of electrolytic aluminum, electrolytic series utilize 500kA electrolyzer, each series installs 366 units, the first electrolytic series has eight rectifier units; The second electrolytic series has eight rectifier units. Our company has provided the project with 16 sets / 32 units of KES-2 × 41KA / 1570V Rectifier Cabinet, 16 sets of KZX10-12 unit steady flow control cabinet, 2 units of ZX-110 Series of Master Control Screen , 2 sets of grid stability control device and 2 sets of rectifying automation control system of ZL-200 position machine.

    This project is China’s second electrolytic aluminum project operated by Isolated Network, there are many first champions at home. Since the power transmission in July, 2015, it has separated from the peripheral large networks and realized the full sense of direct supply through Isolated Network.

 

 

Xinjiang East Hope Nonferrous Metals Co. Ltd. KES-2×41KA/1570V